Reinforced Cement Concrete Retaining Wall
General observe is to ascertain once the RCC wall is prepared for concreting i.e. reinforcement totally busy however ideal observe would be to ascertain it in 2 clinical trial.
01.Centering and shuttering / Formwork:
First check formwork before you permit putting of reinforcement. this can be necessary as sure formworkdefects can’t be corrected or ar tough to correct once reinforcement is placed in position.
Some essential points for inspection of wall forms are covered below:
type panels ought to be checked for adequate attachment and bracing.
- Exterior corners of forms ought to be tied to stop bulging or spreading.
- Resistance to be provided against uplift for prime forms with sloping faces.
- Adequate lap ought to be provided between forms and former construction and connecting hardware to be rigorously secured.
- a skinny film of oil or grease or mould unleash agent ought to be applied to the inner surface of the shuttering to modify simple removal once the concrete hardens.
- the interior and external walls ar to be control along by flat wall tie with wall tie sleeve and PVC cowl. These wall tie sleeve and PVC cowl ar to be cut for the precise length of the wall thickness. Flat wall tie ar to be coated with the shape oil before every usage.
- Plumb formwork each ways in which and firmly support exploitation adjustable steel props.
- The gap between the shutters joint ought to be sealed to stop any discharge of cement suspension.
Download Sheet - Reinforced Cement Concrete Retaining Wall (Cantilever Type) Information/ Download Sheet: Reinforced Cement Concrete Retaining Wall
02. Reinforcement:
- confirm that cowl block used for casting of walls have constant grade as of concrete. they're not broken and properly positioned and may not get disturbed throughout concreting operations.
- Minimum twenty five millimeter cowl ought to be provided in wall.
- most 450 millimeter spacing ought to be provided in between 2 reinforcement.